Structure
Structure designed for seismic consideration stipulated by the code
All Bedrooms
Floor Hard wood flooring in one bedroom and lounge
Imported laminated wooden flooring in other bedrooms
Walls Plastic emulsion on POP punning
Ceiling Oil Bound Distemper on POP punning
Living / Dining / Passage
Floor Imported / Italian Marble
Walls Plastic emulsion on POP punning
Ceiling Oil Bound Distemper on POP punning
All Bedrooms
Floor Hard wood flooring in master bedroom and lounge Imported laminated wooden flooring in other bedrooms
Walls Plastic emulsion on POP punning
Ceiling Oil Bound Distemper on POP punning
Kitchen
Walls Imported Tiles 2'-0" above Counter level with Oil Bound Distemper in the balance area Floor Combination of one or more of Vitrified Tiles / Ceramic Tiles / Marble Stone Counter Marble / Granite
Fittings / Fixtures CP fittings from premium range of superior brands, double bowl stainless steel sink with drain board
Cabinetery Imported modular kitchen
Balcony
Floor Combination of one or more of Vitrified Tiles / Ceramic Tiles / Marble Stone
Ceilings / Walls Exterior paint
Toilets
Walls Combination of one or more of Vitrified Tiles / Ceramic Tiles / Marble / Mirror / Oil Bound Distemper
Floor Combination of one or more of Vitrified Tiles / Marble
Counter Marble / Granite
Fittings / Fixtures Bathtub with jacuzzi & shower cubicle* in toilet attached to Master bedroom
Bathroom fittings from premium range of superior brands
Sanitary fixtures from premium range of superior brands
Doors & Windows
Entrance doors Veneered & Polished flush shutter door with teakwood frame
Internal doors Polished hardwood frame with Veneered flush doors
External Doors & Windows In Powder Coated Aluminium frames with Glazed Sliding / shutter
Hardware
All hardware & hinges in stainless steel
All doors except in the toilet to be provided with the mortice lock
Air Conditioning
Split Units in living, dining, lounge and all bedrooms
Electrical
Modular switches & copper wiring
Provision for 100% power back-up
Others
Video phone & access control security system
CCTV for basement & entrance lobby at ground floor
Boom barrier for main gate
Solar water heating system
Energy efficient products
Roof top rain water harvesting system
Drinking water through individual RO plant
Optic fibre cable with Wi-max connectivity
Provision for Piped gas supply
Street Lighting
Waste water treatment and recycle plant within the project land
Solid Waste Management
Sewerage treatment plant in the project land
Underground cable network
Underground sewerage pipelines
Provision of Telecommunication and other related services
Power backup
All houses connected with the security systems of the main gate and individual buildings through intercom/visual ID system
Lifts in all blocks
Fire protection services
Operation and Maintenance of the project for a period of 99 Years
*Excluding one bedroom unit
Note: Membership/user charges/ O & M Charges wherever required shall be on payment basis.